Saturday, July 10, 2010

Basement Reno - in-built shelves & utility closet

As it turned-out, my tradie partner's flight was cancelled... so Matt returned to the basement to find it exactly as he left it (rather than returning to see it all of his great work finished)! Matt's return was a good thing, as it allowed us to add the closet doors to our big piece of in-built furniture. This was Matt's and my first attempt at hanging cabinet doors... its a tough job.... but with some patience, a few adjustments and the chalk line & line level that Clyde gave me for Christmas, we got the job done pretty well.

We decided to add this in-built piece of furniture to conceal the house's water shut-off valve and meter that lurks behind the utility cabinet (Matt felt that this great piece of craftsmanship was wasted on a ulitity cabinet...). The bookshelves hide the water pipe that was lower than the ceiling we put in.

This is a solid piece of furniture! 5 feet long bookshelves and a 3 foot cabinet from floor to ceiling (about 6.4 feet high). The bookshelves should come in very handy for the kiddos' play things...

Friday, July 09, 2010

Basement Reno - my tradie partner has gone...

Matt arrived in South Bend on 22 June. The next morning we started work on the basement project and we kept working for the next 17 days. Matt was excellent to work with and he did some great work... It is a a rare and wonderful thing for someone to be willing and able to take-off on a 3 week trip and dedicate themselves to helping others out like this... thank you Matt!

after 3 weeks, tradie cracks have emerged... time to get some Man-Show Crack Spackle...

working hard, straight out of bed... no time to do our hair...

Thursday, July 08, 2010

Basement Reno - painting & cabinetry

We are well into the finishing stage... and Matt only has 1 more work day with us - our aim for tomorrow is to get everything done except the flooring.

Today the paint went on - a two-tone effect... but you'll need to see the final result to fully appreciate it.

We are also working on our in-built shelves and utility cabinet...

Big day tomorrow...

Tuesday, July 06, 2010

Basement Reno - drywall sanding, clean-up & primer

What is my least favorite task in this DIY project?
Without-a-doubt the drywall sanding!

After the joint compound is applied with tape to the seams in-between the wall and ceiling boards + on the screws, the excess compound must be sanded smooth to the wall. The dust is super-fine and it gets everywhere (I thought about getting a picture for you, but I didn't want the dust all-over my camera)... it is s miserable task - and it is now over with! The clean-up after the sanding is a task in itself...

Next step was to paint the thirsty (dry)wall and ceiling boards with primer (for the Aussies "the undercoat"). Because the boards have never been painted before, this takes a while and we will need two coats.

The finishing stretch has begun...

Saturday, July 03, 2010

Basement Reno - recap & drywall finishing

RECAP: we are in the middle of a major DIY project.... finishing our basement. Jess and I did the prep work, and then for the last 10 days Jess' brother, Matt, has been helping me... often working long days, sometimes into the early hours... (Matt has been a HUGE help and has been amazing to work with - thank you Matt!!). 
You can see the transformation take shape through some photos at each stage on our Picasa photo album. All the blog updates can be found under our "DIY" category. 

The drywall finishing has begun... using joint compound to hide any gaps between the wall & ceiling boards and cover the many screw holes. Jess is great at finishing tasks (i prefer the building stage), so she has stepped-up with a baby due in 2 months to help out...

Until today, we had kept Ziva out of the basement (she had never gone down the stairs). Now she seems right at home in the basement, keeping a keen eye on her people as they work, from her bed.

Now we wait for the seams to dry and then we have a dusty and uncomfortable task ahead - sanding the excess compound away...

Friday, July 02, 2010

Basement Reno - the wallboards are up!

This stage was much easier than getting the ceiling boards up...

The existing concrete shell is taking shape to become  a finished room.


Next step, drywall finishing... then we paint!

Wednesday, June 30, 2010

Basement Reno - framed!

We have the basement framed...



a "built-in" bookshelf and utility closet to get around the extruding water pipes and shut-off


an old and ineffective heating vent, now framed and sealed for action


Matt spent a long time getting the light switches to be wired and to perform to perfection (we think...???)

Now we go back to drywall...

Tuesday, June 29, 2010

Basement Reno - Video of Matt...

Check-out how we connected the frame of our basement reno to to the concrete floor - this method is quick and fun... similar to firing a gun....


The final result... a 3 inch nail driven into a 2x2 and the concrete floor...


Sunday, June 27, 2010

Basement reno - moisture control...

Many basements seem to be cursed with constant water issues. Our basement is pretty good - the biggest issue we have is condensation, when the warm humid air from outside collides with the cool below-ground air from the basement. Fortunately, that problem exists on the other side of the basement to what we are "finishing."



As a precautionary step however, we are using some pink foam boards that are glued to the masonry walls of the basement. these boards do 3 things:

  1. they act as a barrier that stops the transfer of air of different temperatures that exist inside the basement and outside the basement walls, without this temperature control condensation would form
  2. the boards are lined with a cling-wrap type plastic on both sides, so if moisture was to seep through the concrete walls, in theory the water wouldn't penetrate through to the framing and wallboard - i.e., prevent water damage from seepage
  3. the boards also are an insulating barrier for temperature control and energy efficiency


Next step, framing the walls...

Basement Reno - We have a ceiling...


... and in theory, the most laborious part of the project is done!