Yesterday we began the flooring... We started with the existing concrete floor - it is in good condition, but could certainly use some paint.

Like the precautions we took with the walls, we also need a temperature & moisture control barrier for the floor. We used a layer that promises to be The Warm & Dry Floor System.

We started to lay the laminate flooring, but when we read the instructions, we realized that the flooring needs to be stored in the same place as it will be laid for 24 hours or so to acclimatize to the conditions, so it won't expand or contract. A bump in our plans... we had to put the flooring on ice until today.

This is the look we are going for...

It's not all hard work... there's time for some puppy play along the way...